Equipment Damage Precautions

• Drive into stockpile smoothly with boom fully retracted to load bucket. Loading

bucket with boom extended could damage boom or extension chains/cables. Do
not corner-load bucket.

• Distribute material evenly within the bucket. Bucket capacity charts are for evenly

distributed loads only.

• Do not use bucket as a lever to pry material. Excessive prying forces could

damage bucket.

• Do not use bucket for "back dragging". This could cause severe damage to quick

switch and retraction cables/chains.

Operation:

• Raise or lower boom to appropriate height for loading material from stockpile.

• Align telehandler with face of stockpile and drive slowly and smoothly into pile to

load bucket.

• Tilt bucket up far enough to retain load and back away from pile.

• Travel in accordance with requirements set forth in Section 1 - General Safety

Practices.

• Tilt bucket down to dump load.