Extra power pack (battery, charger & case), Platform auxiliary power lowering device, Laser positioning device – JLG 41AM Operator Manual User Manual

Page 70: Hour meter, Machine cycle counter meter, Hour meter location. (option) -2

Advertising
background image

SECTION 5 - OPTIONAL EQUIPMENT

5-2

– JLG Lift –

3121211

Extra Power Pack

(Battery, Charger & Case)

Includes the battery, charger and molded case.

Platform Auxiliary Power Lowering Device

The Platform Auxiliary Power Lowering device is a switch acti-
vated battery backed electrical circuit designed to provide
power to the platform control box in the event of loss of the
machines power supply.

Laser Positioning Device

Attached to the platform, this device allows the operator to
more accurately position the machine under a work area
before raising the platform in position.

Hour Meter

(See Figure 5-1., Hour Meter Location. (Option)

The machine hour meter accumulates pump operation time
during the platform LIFT UP cycle only. The reading indicates
hours and tenths of an hour.

Machine Cycle Counter Meter

The Cycle Counter Meter is located on the front side of the
Ground Control Station. This meter tracks the number of
cycles the mast travels up and down during macheine opera-
tion. This information can be used to determine maintenance
intervals and other for other informational purposes when

Figure 5-1. Hour Meter Location. (Option)

1. Hour Meter

Advertising
This manual is related to the following products: