JLG 3969electric Service Manual User Manual

Page 27

Advertising
background image

SECTION 2 - PROCEDURES

3120881

– JLG Sizzor –

2-15

Inspection

1.

Inspect the friction plate and the mating surfaces on
the armature and mounting plate for wear and/or
damage.

2.

Examine the compression spring.

3.

Examine the friction plate and the shaft for wear and/
or damage to the spline.

4.

Examine the pole faces of the magnet and the arma-
ture for bruises, swellings or damage. Any bruises,
swellings or damage should be stoned flat.

5.

Examine input and output splines of shaft for wear
and/or damage.

6.

Check ball bearing for axial float and/or wear.

NOTE: It is essential when replacing the friction plate that

spacers are also replaced.

Assembly

1.

Clean all parts thoroughly.

2.

Reverse disassembly procedure above, taking par-
ticular care with the assembly sequence of the fric-
tion plate.

NOTE: Assemble friction plate with two center-punches fac-

ing towards mounting plate.

3.

If a new plate has been fitted, then new spacers will
have to be adjusted for air gap of 0.35 - 0.60 mm
(0.014 - 0.024 in).

4.

After checking air gap, connect power supply.

5.

Switch on power supply and ensure brake fully
releases.

Figure 2-15. Drive Brake Assembly

Advertising
This manual is related to the following products: