SECTION 4 - BOOM & PLATFORM

3121105

– JLG Lift –

4-13

4.6

BOOM LOAD RADIUS SETUP
PROCEDURES - 100SX DUAL CAPACITY

NOTE: The boom length and angle sensor adjustments

need to be made before the display lights are
adjusted.

The boom length and angle sensor is factory set and
does not normally require adjusting unless it is
removed from the base boom for maintenance.

Length Indicator Adjustment

1.

Level the frame before beginning any adjustments.

2.

Make all adjustments with the engine running unless
otherwise noted.

3.

Fully retract the boom.

4.

On the Load Radius Circuit Card, measure TP10 and
insure that 10 Volts DC (+0.1/-0 Volts DC) is present.

5.

On the Load Radius Circuit Card, adjust P1 to 1.114
Volts DC while measuring TP1.

6.

Make the following adjustment with the power off.
On the Load Radius Circuit Card, disconnect con-
nector J2 (the 6 pin connector on the printed circuit

board). Measure between Pin (6) of the socket on
the circuit board and ground (TB1-1), adjust potenti-
ometer P5 to a value of 1.610 Ohms (+/- 0.005
Ohms). Reconnect J2 when adjustment is complete

7.

Turn the power on and measure TP2. It should be
1.183 Volts DC. Re-adjust the 5K Ohm potentiometer
in the boom cable reel if necessary. Adjust the 5K
Ohm potentiometer by loosening the three screws
holding it in place. Tighten the three (3) screws
when adjustment is complete.

Figure 4-7. Load Radius Card