16.

Continue installing remaining components to mast
assembly, (i.e. hydraulic pump/motor/reservoir, bat-
tery charger, etc.).

2.10 MAST CHAINS/CABLES AND

SEQUENCING CABLES ADJUSTMENT

Mast Chain/Cable Adjustment

The intention of this procedure is to assure equal load dis-
tribution between the individual chains/cables of a mast
section chain/cable set.

Adjust using the following procedure;

1.

With mast retracted, step into the platform and
bounce your weight up and down a few times to be
certain platform is at the bottom of travel. Be certain
all chain/cable sets are seated in their sheaves prop-
erly at the top of each mast section.

2.

Then with no load in the platform check the side pro-
file of the top of the mast for the amount of adjust-
ment necessary to make the mast sections even for
mast sections-3 and up. (See Figure 2-20.)

NOTE: Mast section-1 is fixed to the base and mast section-

2 is attached to the lift cylinder, these sections
require no adjustment.

Figure 2-20. Mast Chain/Cable/Sequence Cable Adjustment Components.

SECTION-1

FIXED

TO BASE

SEQUENCE CABLE

ADJUST NUT

MAST COVER

SHOWN REMOVED

SECTION-2

EXTENDED BY

CYLINDER

SECTION-5

(PLATFORM

HEADER SECTION)

EXTENDED BY

CHAIN/CABLE

CHAIN/CABLE

ANCHOR PLATE

ADJUST NUT

JAM NUT

THREADED

CHAIN/CABLE

END

Note: When

pply Loctite #242 to the

threads under the jam nut.

.

chain adjustment

is complete, before

tightening the jam nut

against the adjust nut,

a

SECTION-4

EXTENDED BY

CHAIN/CABLE

SECTION-3

EXTENDED BY

CHAIN

ADJUST UNTIL TOPS OF MAST

SECTIONS ARE EVEN

MAST SIDE PROFILE

MAST CHAIN/CABLE ADJUSTERS