11. cordless drill installation -8 – JLG LiftPOD FS80 (1001070465) User Manual

Page 36

Advertising
background image

SECTION 3 - MACHINE OPERATION

1001070465

LIFTPOD by JLG

3-8

www.liftpod.com

NOTE:

When reversing the procedure to disassemble the
machine, pull the platform latch handle (C) to disengage
the platform from the carriage.

7. Fasten lanyard securely around the handle of the cord-

less drill. Attach the cordless drill to the top of the drive-
shaft, either using the supplied 7/16 (11mm) deep well
drive socket (located in manual pouch), or by tightening
the drill chuck directly to the hexagon on top of the
driveshaft (see Figure 3-11.).

CORDLESS DRILL LANYARD MUST BE INSTALLED BEFORE ELEVATING.
DO NOT DROP DRILL.

Figure 3-11. Cordless drill installation

Driveshaft

Drive Socket

Lanyard

Cordless Drill

(optional)

Manual Pouch

Advertising
This manual is related to the following products: