6 mast assembly and disassembly procedures, Mast disassembly procedure, Mast assembly and disassembly procedures -13 – JLG DVSP Series Service Manual User Manual

Page 101: Mast disassembly procedure -13, Mast section - assembly reference -13, Dvl/dvsp mast component features -13

Advertising
background image

SECTION 5 - MAST COMPONENTS

3121136

– JLG Lift –

5-13

5.6

MAST ASSEMBLY AND DISASSEMBLY
PROCEDURES

The DVL/DVSP lift mast sections are constructed of extruded
aluminum, protected with an anodized surface finish. The
mast sections are interlocked into each other when assem-
bled, by internally mounted slide pads at the top and bottom
of each mast section. These slide pads run up and down in
slide pad channels on each side of the mast.

The DVL/DVSP model mast assembly contains a different
number of mast sections as shown following;

Assembly procedures for all mast sections is basically the
same, carefully slide the mast sections together until mast
ends are even. (When sliding the mast sections together, be
careful not to scratch the anodized surface).
Assemble the
hardware to the bottom of mast section first, slide this sec-
tion out the top of previous section and assemble hardware
to the top of mast. Always install slide pad shims with slide

pads inserted into the slide pad channels, (ends of mast
sections even).
Applying silicone spray onto the slide pads
and slide pad channels before assembly will help mast sec-
tions slide easier after slide pads have been properly
shimmed.

Mast Disassembly Procedure

1.

After the mast assembly has been removed from the
machine, lay the mast assembly down on a suitable
work table with the platform mounting section on
top, facing up.

2.

Remove the sequencing cables and hardware from
the sides of the mast assembly. Also remove the
covers from the top of the mast assembly.

MAST SECTION-5 - REMOVAL

3.

Remove chain adjust nuts from threaded ends of
chain attached to the chain anchor plate (lower) on
BOTTOM end of mast section-5 (platform mounting
section)
. Push threaded ends of chain through
anchor plate.

4.

At the TOP of mast section-5, pull chains out and
allow to hang loose. (Be certain floor surface is
clean and free of any metal chips or debris which
may stick to lubricated chains)

Table 5-1. DVL/DVSP Mast Component Features

Model

No. of Mast

Sections

Extend/Retract

Device

DVL Series

& DVSP

5

Chain

Figure 5-5. Mast Section - Assembly Reference.

OPEN RAIL

(REFERS TO OPEN RAIL

FRONT OF MAST SECTION)

CLOSED RAIL

(REFERS TO CLOSED RAIL

BACK OF MAST SECTION)

BOTTOM

(REFERS TO BOTTOM END OF

MAST SECTION WHICH SETS IN

MACHINE’S BASE FRAME)

TOP

(REFERS TO TOP END

OF MAST SECTION

WHERE COVER AND

SHEAVE WHEELS

ARE ATTACHED)

Advertising