Upper/lower shell attach screws, Emergency stop switch installation, Upper/lower shell component connections – JLG DVSP Series Service Manual User Manual

Page 77: Button pad installation

Advertising
background image

SECTION 4 - CONTROL COMPONENTS

3121136

– JLG Lift –

4-19

Upper/Lower Shell Attach Screws

IMPORTANT

CAREFULLY SLIDE THE UPPER SHELL HALF FROM THE LOWER
SHELL HALF. THE COMPONENTS MOUNTED IN THE UPPER SHELL
HALF CONNECT TO THE CIRCUIT BOARD IN THE LOWER SHELL
HALF.

Emergency Stop Switch Installation

Upper/Lower Shell Component Connections

Button Pad Installation

Upper/Lower Shell Installation

1. Remove the (4) Phillips Head Screws from the
Lower Shell Housing.

Emergency Stop Switch Installation

1. Emergency Stop Button

4. Button Assembly Nut

2. Seal

5. Emergency Stop Switch

3. Square Lock Washer

6. Switch Release/Lock Lever

1

1

2

3

4

5

6

Platform Control Console Circuit Board Connections

1. Connection to Ground Control Module
2. Emergency Stop Wiring Connector
3. External Programming Socket Connector
4. Joystick Ribbon Cable Connector

Button Pad Installation

1. Button Pad Assembly

(Attached by adhesive backing)

1

2

3

4

1

Advertising
This manual is related to the following products: