4 machine set-up and operation, Floor stop operation, 4 machine set-up and operation -7 – JLG 15SP Operator Manual User Manual

Page 41: Floor stop operation -7

Advertising
background image

SECTION 4 - MACHINE OPERATION

3120774

– JLG Lift –

4-7

4.4 MACHINE SET-UP AND OPERATION

The following sequence of set-up procedures must be followed to
safely operate this machine.

1. Position machine in work area. Work area must be a

smooth, firm, level surface.

NOTE: Check that battery box assembly is installed, battery is

charged and connected to the machine’s DC receptacle.

2. Set Power On/Off Key switch to the ON position at the

ground control station.

3. Check both Emergency Stop switches, one on platform

control station and one on ground control station, they
must be in the reset position for operation.

4. Set Floor Stop, see steps following.

Floor Stop Operation

(See Figure 4-5.)

1. Located on both sides of the machine under the base

frame, behind either of the front caster wheels, are the
floor stop assemblies. Engage and lock one or both of
the floor stop assemblies down into position

THE FRONT CASTER WHEELS SHOULD BE RELIEVED OF THE MACHINES
WEIGHT ENOUGH SO THE MACHINE DOES NOT ROLL IN ANY DIRECTION.
IF THIS IS NOT THE CASE DO NOT ATTEMPT TO ELEVATE THE PLATFORM
UNTIL THE FLOOR STOP IS OPERATING PROPERLY.

2. To disengage the floor stop, apply pressure to the

release rod or lift up on the floor stop pedal.

Advertising
This manual is related to the following products: