SECTION 4 - MACHINE OPERATION

4-8

– JLG Lift –

3120774

Raising and Lowering the Platform

1. Enter platform and close the entry gate, see Section 4.5,

PLATFORM CONFIGURATIONS.

2. Attach your fall protection harness to the applicable lan-

yard attachment on the machine.

NOTE: On the platform control panel the FUNCTION ENABLE

(green button) must be depressed simultaneously with
either the UP or DOWN button in order for these functions
to work.

DO NOT ATTEMPT TO RAISE THE PLATFORM UNLESS EITHER OF THE
FLOOR STOP ASSEMBLIES IS PROPERLY SET AND MACHINE IS ON A
SMOOTH, FIRM, LEVEL SURFACE.

BEFORE AND WHILE RAISING THE PLATFORM, CHECK CLEARANCES
ABOVE AND AROUND PLATFORM AND MAST TO ENSURE ADEQUATE
CLEARANCE OF SURROUNDING OBJECTS AND PERSONNEL.

NOTE: Machines equipped with the platform gate alarm (option),

when the platform is raised approximately 2 in. or more,
the platform gate alarm will sound if either of the platform
gates are opened.

3. To RAISE platform up, depress the FUNCTION ENABLE

BUTTON (green) and PLATFORM UP BUTTON (top,

Figure 4-5. Engaging & Releasing Floor Stop.

ENGAGING FLOOR STOP

RELEASING FLOOR STOP