12 shut down and park, 13 machine lifting and tie down, Lifting – JLG M450 Operator Manual User Manual

Page 63: Tie down, Lifting -13 tie down -13

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121647

– JLG Lift –

4-13

4.12

SHUT DOWN AND PARK

NOTE:

When parking battery powered units overnight, batteries should
be charged in accordance with instructions in Section 2 to
ensure readiness for following workday.

NOTE:

Electric machines are equipped with a static strap due to static
electricity build-ups. Strap is located under rear of machine chas-
sis.

To shut down and park the machine, the procedures are as fol-
lows:

1.

Drive machine to a reasonably well protected area.

2.

Ensure boom is lowered over rear drive axle.

3.

Shut down Emergency Stop at Platform Controls.

4.

Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center Off.

5.

If necessary, cover Platform Controls to protect instruction
placards, warning decals and operating controls from hostile
environment.

4.13

MACHINE LIFTING AND TIE DOWN

See Figure 4-4.

Lifting

1. Refer to the Serial Number Plate, refer to the Specifica-

tions section of this manual, or weigh the individual unit
to find out the Gross Vehicle Weight.

2.

Place the boom in the stowed position.

3.

Remove all loose items from the machine.

4. Attach lifting device and equipment only to the desig-

nated lifting points.

5.

Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.

Tie Down

1.

Place the boom in the stowed position.

2.

Remove all loose items from the machine.

3.

Secure the chassis and the platform using straps or chains of
adequate strength.

Advertising
This manual is related to the following products: