Wheel torque chart -19 – JLG M450 Operator Manual User Manual

Page 99

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121647

– JLG Lift –

6-19

2.

Tighten nuts in the following sequence:

3.

The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.

4.

Wheel nuts should be torqued after first 50 hours of operation
and after each wheel removal. Check torque every 3 months or
150 hours of operation.

Table 6-10. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

40 ft. lbs.

(55 Nm)

100 ft. lbs.

(130 Nm)

170 ft. lbs.

(255 Nm)

Advertising
This manual is related to the following products: