ELECTRICAL HOOK-UP
CAUTION –
Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specifi ed.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Place the heater switchs at the rear of the brewer in the "OFF" lower position.
4. Remove the front panel beneath the sprayheads.
5. Feed the cord through the strain relief(s) and connect it to the terminal block(s).
6. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-

place the front panel.

7. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing

has been hooked up, the brewer is ready for Initial Set-Up.

10737 081706

P1843

120/208 & 120/240V ac

single phase models

Note: This electrical service

consists of 3 current carrying

conductors (Neutral, L1 and

L2) and a separate conductor

for earth ground.

Some 4/2 & 0/6 models

require two individual branch

circuits.

GREEN

GREEN

BLK

RED

120V. A.C.

120V. A.C.

208 or 240V. A.C.

WHI

L1

L2

N

200 or 230V ac

single phase models

Note: This electrical service

consists of 2 current carry-
ing conductors (L1 and L2)

and a separate conductor

for earth ground.

ELECTRICAL REQUIREMENTS

WARNING - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.

Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

GREEN

GREEN

200 or 230V. A.C.

BLK

RED

L1

L2

GREEN

GREEN

230V ac

3 phase models

Note: This electrical service

consists of 3 current carry-
ing conductors (L1, L2 and
L3) and a separate conduc-

tor for earth ground.

BLU

RED

BLK

230V. A.C.

230V. A.C.

230V. A.C.

L1

L2

L3

P1843