Installation instructions – Autoquip GATES SWING User Manual

Page 28

Advertising
background image


INSTALLATION INSTRUCTIONS

WARNING

!

Never run the unit with the gates or doors open! The gates must
not open when the lift is in operation or when the platform is not
present. Should this condition exist, the interlock is not
functioning properly due to incorrect installation or damage.
This condition must be corrected immediately. Failure to correct
this condition may result in serious injury or death.


NOTE:
With the G.A.L. interlock, it may be necessary to extend the roller arm out to
the strike. It may not be possible to extend the strike out because of floor clearance.
The only option is to extend the roller mount out to meet the strike. This can be
done with a piece of ½” x 1” bar cut and drilled for the length needed.

NOTE: The lift MUST NOT operate unless the gate(s) are closed and the MUST

NOT operate unless the lift is at the same floor level as the gate which is to be
opened.


G.A.L. SDM WIRING INFORMATION

• The contact blocks are wired in series between the terminals specified on the

electrical schematic.

DANGER

!


Qualified personnel only!! Only qualified service personnel
should perform procedures labeled as “dangerous”!










28

Advertising