INSTALLATION INSTRUCTIONS


12. After determining proper operation, weld additional support bracing in place and

complete the anchoring of the gate posts.


NOTE: Make sure that the supports do no interfere with any portion of the lift
platform, wheel blocks, or means of lifting.


13. Mount both the upper and lower limit switches to the rear of the post tubes (see

Figure 18). The switch arms must be rotated 90 degrees so they will contact the
switch cam mounted to the gate panel.


14. With the ¼”-20 UNC screws and the Unistrut nuts, mount the switch activation

cam(s) to the Unistrut channel(s) mounted to the gate panel (see Figure 18).


15. When the electrical hook-up is complete, test the gate for operation and adjust the

torque limiter so that it will slip whenever the gate panel is either fully up or fully
down and power has not been interrupted by the upper or lower limit switch(s).


NOTE: The lift MUST NOT operate unless the gate(s) are closed and the gate MUST

NOT operate unless the lift is at the same floor level as the gate which is to be
opened.


16. Install enclosure panels (if required).