C.B.S. Scientific LPE-4003-220V User Manual

Page 10

Advertising
background image

10

LPE Instructions 5-5-14

3.3

Alamo Precast Gel Preparation, con’t.

4)

Place loaded upper reservoir onto lower

reservoir assembly.

5) Place sample applicator between glass

plates.

6) Gently tap down until it makes contact

with the gel.

7) Keep tapping down the sample ap-

plicator until the gel “pillows” up into
the sample wells.

8) Turn buffer cycling pump “ON”

(toggle switch will be in “I” position)
until upper reservoir is filled (over top
of sample applicator).

Displace any

bubbles in sample wells.

4

5

6

7

Advertising
This manual is related to the following products: