H-1

95-8556

10.1

Appendix H

EaglE Quantum PrEmiEr comPatiblE oPEcl

installation and wiring
The Eagle Quantum Premier (EQP) version of the Model OPECL Open Path Eclipse uses the identical installation

procedure, device location guidelines, and power supply requirements as described in the “Installation” section

of this manual. Refer to the EQP version wiring diagram for specific wiring termination guidance.

An important difference in EQP applications is that LON network cabling will be routed both in and out from the the

EQP OPECL receiver enclosure, so this requirement should be anticipated and planned for during installation.

Note that only the receiver is connected to the LON network. The transmitter is not connected to the LON and

requires wiring for operating power only.

Important

Det-Tronics recommends the use of shielded cable (required by ATEX) to prevent external electromagnetic
interference from affecting field devices.

Important

For best fault isolation performance, the maximum LON wiring length should not exceed 1600 feet (500
meters).

Important

Be sure that selected cable meets all job specifications. The use of other cable types can degrade system
operation. If necessary, consult factory for further suggested cable types.

Table H-1—LON Maximum Cable Lengths

lon cable

maximum length**

(manufacturer and Part no.)*

Feet

meters

Belden 8719

6,500

2,000

Belden 8471

6,500

2,000

FSI 0050-000006-00-NPLFP

6,500

2,000

Technor BFOU

4,900

1,500

Level IV, 22 AWG

4,500

1,370

Note: *Use the same type of cable in each wiring segment between

network extenders.

**Maximum wire lengths represent the linear wire distance of
LON communications wiring between network extenders.

The maximum wire lengths given in Table H-1 are based upon
the cable’s physical and electrical characteristics.