Assembly guide – Bowflex Elite™ home gym User Manual

Page 16

Advertising
background image

A-14

Step 18 - Attach the Rod Box Frame to the Lat Tower

Locate the following items:

• From Step 16 - Main Assembly
• From Step 17 - Rod Box/Frame Assembly
Item #K - (2) 3/8" X 5" Button Head Screws
Item #N - (4) 3/8" Washers
Item #O - (2) 3/8" Nylock Nuts

Align the bolt holes on the Rod Box brackets with the bolt
holes on the Lat Tower above the Chest Bar , as shown in
Figure 18.

Place (2) 3/8" Washers (Item #N) over the ends of
(2) 3/8" X 5" Button Head Screws (Item #K) - one washer
per screw. Insert the screws through the aligned holes. Place
(1) 3/8" Washer and (1) 3/8" Nylock Nut (Item #O) over the
end of each screw and tighten.

Completely tighten hardware installed during Step 18.

Step 19 - Attach the Faceplate to the Main Assembly

Locate the following items:

Item #26 - Faceplate
• From Step 18 - Main Assembly
Item #A - (2) #10 Phillips Head Screws

Position the textured side of the Faceplate (Item #26) against
the Lower Lat Tower. Insert the plastic “stems” through the
corresponding holes on the Lower Lat Tower, as shown in Figure
19
. You may need to push the Power Rods® out of the way to
insert the screws into the holes.

Attach the Faceplate to the Lower Lat Tower by threading
(2) #10 Phillips Head Screws (Item #A) into the “stems”.

Do not completely tighten hardware installed during Step 19 -
tighten screws approximately 1/2 of completion. Hardware will
be tightened during Step 20.

Figure 18

O

N

Rod Box

Brackets

Chest Bar

K

Figure 19

A

26

Faceplate

“Stems”

Assembly Guide

Advertising