6.5

Install self-adhering flashing (see Section 5.1) in shingle

fashion by first installing the sill flashing (see Figure 6c). Then install

the window in accordance with the manufacturer’s installation

instructions. When the window is in place, install the jamb and

head flashings in shingle fashion (see Figures 6d and 6e). Then

cover the head flashing at the top of the window with the building

wrap (see Figure 6f).

6.6

When the end of the roll is reached, fold the edge of the

building wrap under itself and fasten securely.

6.7

Vertical and horizontal seams must be overlapped a

minimum of 6 inches (vertical) and 2 inches (horizontal) unless

otherwise specified for a particular application. Upper courses

of building wrap must overlap lower courses in water-shedding

fashion. Building wrap seams can be taped using GreenGuard

®

Custom Contractor Tape or an equivalent tape approved by Pactiv

(optional, see Section 5.2). If the building wrap is intended to

perform as the primary air barrier in the wall system, then all

seams must be taped and all penetrations must be sealed using

GreenGuard

®

Contractor Tape, GreenGuard

®

Flashings, sealant, or

spray foam.

Figure 6c: Installation of Sill Flashing

Figure 6d: Installation of Jamb

Flashing

Figure 6e: Installation of Head

Flashing

Figure 6f: WRB Overlaps Head