Hypercharger for yamaha, Installation – Kuryakyn 9422 HYPERCHARGER for YAMAHA V-STAR 650 User Manual
Page 2

PAGE
2
STEP 1
Read and understand all steps in the instructions before starting the installation. Park the
motorcycle on a hard, level surface and turn off the ignition. Let cool.
YOU WILL BE WORKING AROUND THE ENGINE AND EXHAUST SYSTEM
DURING INSTALLATION. ENSURE THAT THE ENGINE AND EXHAUST
SYSTEM HAVE FULLY COOLED TO PREVENT INJURY.
A FACTORY SERVICE MANUAL WILL BE HELPFUL IN PERFORMING THIS
INSTALLATION. DO NOT ATTEMPT TO PERFORM THIS INSTALLATION IF
YOU ARE NOT CONFIDENT IN YOUR ABILITY TO COMPLETE ALL OF THE
STEPS IN THE PROCEDURE; CONSULT A TRAINED TECHNICIAN.
IMPROPER INSTALLATION COULD RESULT IN SERIOUS INJURY OR
DEATH.
Installation of this kit
REQUIRES
carb re-jetting over and above what may have
already been performed for pipe installation. This is a complex procedure and we
strongly recommend that this be performed by your dealer or a competent
mechanic. If you choose to attempt this on your own, you will need the service
manual for this model as carb removal and disassembly instructions are not
provided in this literature.
THE FOLLOWING JETTING RECOMMENDATIONS ARE
INTENDED AS A STARTING POINT.
Optimal performance and driveability may
require fine tuning. Adjustments may be needed for higher altitudes. General rule
of thumb is one jet size smaller for every 3000-4000 feet of elevation.
Rejetting and tuning a motorcycle can be a complex task. Due to factors outside of
our control, Küryakyn will not be held liable for any labor costs incurred from
installation of this kit.
Cobra/Stock
Exhaust
Main
Jet
117.5
Pilot
Jet
35
PMS Screw 1-1/2 Turns Out From Bottom
V&H Style or Open Pipes
Main
Jet
120
Pilot
Jet
35
PMS Screw 1-1/2 Turns Out From Bottom
The installation of any high performance exhaust system can cause a
“lean” fuel/air mixture. A “lean” fuel/air mixture can cause engine
overheating resulting in severe engine damage. Küryakyn
recommends rejetting carbureted bikes.
STEP 2
Remove the stock air cleaner and components to the point shown in
PIC.1. The stock plastic airbox adapter “A” and stock mounting brackets
“B” will remain in place.
STEP 3
Insert both flanges of the rubber adapter through the mounting bracket
as shown in PIC.2. The hardware components used for installation are
placed near their respective mounting points:
•”A” Socket head cap screw - 30mm long, tapered bolt cap, and
two spacers. The spacers are placed between the chrome, and
the stock mounting brackets.
•”B” Socket head cap screw - 15mm long , tapered bolt cap
•”C” Socket head cap screw - 30mm long, tapered bolt cap, two spacers (place between
chrome and stock brackets), and flange nut.
•”D”
Mounting
holes.
HYPERCHARGER for YAMAHA
INSTALLATION
-cont.-
PIC 1
A
B
B
B
PIC 2
B
D
D
A
C
STOCK INTAKE
CLAMP