Bionix® EnviroBath™ Chamber

Installation

19

Installation

This section provides general installation guidelines and illustrations for the most
common mounting configurations.

General Installation Guidelines

Tubing and connector

requirements

Because of the variety of process fluids that can be used, MTS recommends
using only MTS supplied tubing and connectors. Use of improper tubing and
connectors could void any warranty.

Saline Distribution Assembly

The following illustration shows a typical setup using a saline distribution
system.

POSITIVE HEAD REQUIRED.

CHAMBER MUST BE ABOVE

PUMP AND CONNECT TUBING

FOR PROPER CIRCULATION AND DRAIN.

RESERVOIR WITH ACTIVE TEMP CONTROL FUNCTION

USE 1/2 INCH ID

(0.9% SALINE, MAX)

SILICONE EXTENSION TUBING

BIONIX CHAMBER

COUPLING

COUPLING

4.

FOR ALL CONNECTIONS

PRESSURE OF 1.6M [66"] (APPROX.)

QUICK

HEATER/CIRCULATOR

QUICK

THE CIRCULATION PUMP HAS LIMITED HEAD PRESSURE/FLOW PERFORMANCE. ZERO FLOW WILL OCCUR AT HEAD A

SPEED SETTING UNLESS A SAFE STEADY-STATE FLUID LEVEL CAN BE ESTABLISHED.

IMPORTANT OPERATIONAL TIPS

:

GRAVITY DRAIN SYSTEM:

TUBE ROUTING FROM UPPER QUICK COUPLING MUST BE GENERALLY DOWNWARD.

1.

LOWER QUICK COUPLING MUST BE ABOVE RESERVOIR FOR CHAMBER TO DRAIN COMPLETELY WHEN PUMP IS SWITCHED

2.

OFF.

BEWARE OF OVER FILLING CHAMBER: UNDER STEADY-STATE CIRCULATION CHAMBER FLUID LEVEL WILL TYPICALLY BE 2-4

3.

CM (3/4"-1-1/2") ABOVE UPPER QUICK COUPLING PORT. DO NOT ALLOW IT TO REACH THE UPPER SURFACE OF THE

SAMPLE COMPARTMENT. THE CIRCULATION PUMP HAS "HIGH" AND "LOW" SPEED SETTING. DO NOT OPERATE AT HIGH

GLASS

THERMOMETER

3-WAY VALVE

CHECK VALVE