MTS Series 315 Load Frame User Manual

Page 22

Advertising
background image

Series 315 Load Frame

22

Installation

7. Place the load frame onto the isolation pads.

Install stock metal shims between the pads and the floor.

C.

Lower the load frame gently into place.

D. Replace the actuator side covers.

8. Remove the chains.

Load Frame

Install
Shims
to Level

Floor

Isolation Pads

Advertising