Operating procedures, Operating procedures 29 – MTS Model 286-30 Pore Pressure Intensifier User Manual

Page 29

Advertising
background image

Operating Procedures

286.30 Pressure Intensifier

Operation

29

Operating Procedures

The operating procedures are presented here in the usual order of occurrence.
The first procedure,

“Filling the Reservoir”

on page 30, assumes the reservoir is

to be filled for the first time, or that fluid quantity in the reservoir needs to be
replenished. Subsequent procedures assume that the condition of the system is as
established by the successful performance of the immediately preceding
procedure.

Hydraulic power will be applied during some operating procedures.

Conditions hazardous to life and equipment exist on all systems or
equipment that may be connected to the same hydraulic power source.

Before turning on hydraulic power, first make sure that all systems or equipment
that use the same hydraulic power source are in appropriate condition for
application of hydraulic power.

Make certain no one is performing work on other systems or equipment sharing
the same hydraulic power source.

Inform other people in the vicinity that you are about to turn on hydraulic power.

WARNING

Advertising