Transport, scope of delivery, installation, 7 installation of the machine – Retsch SM 300 User Manual

Page 13

Advertising
background image

Transport, scope of delivery, installation

13

Push the plunger downwards.

Screw the two provided socket-head screws (S) through the hinge on the
feed hopper into the enclosure.

At first, tighten the screws only slightly.

Close the grinding chamber door.

Pull the handle on the door catch (F) forwards until the mini detent pin (E)
engages.

Adjust the feed hopper until the plunger can be moved upwards and
downwards easily without jamming.

Tighten the two socket-head screws securely. (10Nm)

Check again if the plunger moves upwards and downwards easily without
jamming.

Put the two protective caps (SK) onto the screws (S).

Fig. 4: Putting on the Protective Caps

NOTE

When new, the grinding chamber door and the handle on the door latch are
somewhat difficult to move.

3.7 Installation of the machine

Installation height: maximum 2000 m above sea level

NOTE

Installation

Depending on the operating status of the mill, there may be slight
vibrations.

Place the mill on an even, flat and balanced supporting surface only.
The supporting surface must be stable and must not vibrate.

S

Advertising