RKI Instruments 65-2396RK User Manual

Page 10

Advertising
background image

6 • 65-2396RK CO

2

Transmitter

6.

Guide a three-conductor, shielded cable, or three wires in conduit through the top
conduit hub of the junction box.

7.

Pull out the controller terminal strip, and connect the three wires to the terminal strip
as follows (see Figure 3).

Connect the positive wire to the

PWR/SIG “+”

terminal.

Connect the signal wire to the

PWR/SIG “

S”

terminal.

Connect the negative wire to the

PWR/SIG “-”

terminal.

CAUTION:

If shielded cable is used, leave the cable shield’s drain wire disconnected and
insulated at the transmitter. You will connect the opposite end of the cable’s drain
wire to the controller’s chassis (earth) ground.

8.

Reinstall the controller terminal strip into its socket.

9.

Secure the junction box cover to the junction box.

10. Route the cable or wires leading from the CO

2

transmitter through one of the conduit

hubs at the controller housing.

CAUTION:

Do not route power and transmitter wiring through the same controller conduit hub.
The power cable may disrupt the transmission of the transmitter signal to the
controller.

11. Connect the wires to the applicable detector/transmitter terminal strip at the

controller as shown in Figure 3.

Advertising