SET(U)-F / ITT(U)-F Manual

IM091221

RD: FEB 2014

RL: 8B

V

ERTICAL

VENT

THROUGH

THE

ROOF

:

It is the sole responsibility of the installer to ad-
here to all current local codes and/or ANSI
Z223.1 / CSA.B149.1 latest editions for all vent-
ing requirements, and practices.



Use an approved ‘B-vent’ termination cap as
supplied by the manufacturer of the approved
‘B-vent’.



When vent and combustion air are taken
through the roof, the exhaust vent should al-
ways terminate higher than the combustion
air intake, to prevent recycling the products of
combustion back into the heater.

Approved
Cap

Approved
‘B’ Vent

24”

60 cm

12

9

If roof slope exceeds 9:12
consult NFPA-54 ANSI
Z223.1 or CSA-B149.1

FIGURE 19

Up

to

11A. Combined System Length: Tube Heater + Vent + Combustion Air Duct

:

MINIMUM VENT LENGTH: (Vented or Unvented)



Minimum vent length of 3 ft x 4” [91 cm x 100 mm] diameter is required

MAXIMUM SYSTEM LENGTH (includes:

Tube Heater length + combustion air duct + vent

):



Each 90° elbow in the system has an equivalent length of 5 ft (air duct, tube, or vent pipe).



A maximum of 2 elbows are allowed in any portion of air duct, tube heater, vent pipe, with
the exception of up to three 90° elbows in a vertical vent run through the roof



Vent pipe diameter shall be 4” [100 mm] for a single heater, or 6” [150 mm] combined vent
for two heaters - do not substitute any other vent diameter



The maximum length of combustion air duct to any heater is not to exceed 30 feet of 4 inch
[100 mm] diameter duct or 50 ft x 5” diameter duct



Exceeding the allowable lengths in the table below can create combustion and/or conden-
sation issues and will void CSA Design Certification and the heater warranty.

Do Not Exceed

Max. Combined

System Length*

Max. Vent

Length*

Individual: 4” Ø

Combined: 6” Ø

Max. Air Duct

Length*

(by Duct Diameter)

4” Air Duct 5” Air Duct

4” Ш

5” Ш

80 / 60,000

80 ft

100 ft

Up to 40 ft

30 ft

50 ft

110 / 75,000

100 ft

120 ft

Up to 40 ft

30 ft

50 ft

130 / 90,000

100 ft

120 ft

Up to 40 ft

30 ft

50 ft

155 / 110,000

100 ft

120 ft

Up to 40 ft

30 ft

50 ft

175 / 125,000

120 ft

140 ft

Up to 50 ft

30 ft

50 ft

200 / 140,000

120 ft

140 ft

Up to 50 ft

30 ft

50 ft

Input

(Btuh)

* Regardless of the allowed maximum length of the individual vent or combustion air duct, do

not exceed the Maximum Combined System Length which includes the length of the tube
heater plus the air duct and the vent.

Example

155/110,000 Btuh Heater:

Tube Heater Length

50 ft

1 x 90° elbow (vent)

5 ft

Straight vent

20 ft

1 x 90° elbow (duct)

5 ft

Air Duct: 4” Ø

17 ft

Combined Length

97 ft

Max. Allowed

100 ft