Schwank IT(U) User Manual

Page 8

Advertising
background image

GP-MSEM-BX-06A

SEM(U) / IT(U) Manual

RD: Aug 2006

RL: 06A

KH

5. PRE-INSTALLATION SURVEY

The SEM(U) / IT(U) heating system must
have gas piping of the correct diameter,
length, and arrangement to function properly.
For this reason, a layout drawing is nec-
essary.

Carefully survey area to be heated, and for
best results, whenever possible, place burner
and combustion chamber in coldest area.

6. MOUNTING CLEARANCES

This heater must be mounted and positioned
to maintain the minimum clearance to com-
bustible materials as shown in FIGURE 1 &
TABLE 3. For recommended heater place-
ment refer to TABLE 2 (below). Heaters
should also be located and installed with re-
spect to building construction and equipment

to provide a minimum clearance of 24 inches
from the end of burner housing for servicing
and cleaning of burner, blower and controls.
A minimum horizontal clearance of 4 ft. from
electrical meters, gas meters, regulators and
relief equipment is required by ANSI Z223.1.
& CSA B149.1-00.

TABLE 2 RECOMMENDED HEATER PLACEMENT


MODEL

MOUNTING

HEIGHTS

(FEET)

MAXIMUM

DISTANCE

BETWEEN

HEATERS

(FEET)

DISTANCE-OUTSIDE WALL

TO HEATER LONG AXIS

PARALLEL TO WALL (FEET)

HORIZONTAL

ANGLE

SEMU/ITU

200

18 – 25

50

17 – 25



COMBUSTIBLE

CLEARANCE

SEMU/ITU

175

18 – 25

50

17 – 25

SEMU/ITU

155

16 – 21

45

15 – 20

SEMU/ITU

130

15 – 21

40

15 – 20

SEMU/ITU

110

13 – 19

35

13 – 18

SEMU/ITU

80

10 – 16

30

12 – 16

SEMU/ITU

60

8 – 14

25

11 – 15

SEMU/ITU

100

13 – 19

35

13 – 18

IMPORTANT: Continuous operation of single or multi-heater placement must
not cause any combustible material in storage to reach a
temperature in excess of 160

O

F.

Page 4

Advertising
This manual is related to the following products: