Installation – Skyjacker NBP103 User Manual

Page 2

Advertising
background image

Pg 2

Installation:

1. With the vehicle on flat level ground, set the emergency brake, &

block the front & rear tires / wheels.

2. Align the new Skyjacker nerf bar with the front & rear fender wells &

support the new nerf bar using jacks / jack stands.

3. Align the mounting brackets of the new Skyjacker nerf bar with the

OEM holes located on the frame rail of the vehicle.

4. Mark a line on the OEM skid plate around the rear mounting bracket

of the new Skyjacker nerf bar. (See Photo # 1)

5. Remove the outer OEM skid plate hardware & lower the OEM skid

plate in order to cut along the previously drawn line using a jig saw or

similar tool. (See Photo # 2)

6. Once the OEM skid plate has been cut, reattach the OEM skid plate

using the OEM hardware.

7. Drill the two upper rear OEM frame rail mounting locations using a

5/16" drill bit & install the supplied 3/8" x 1" thread cutting bolts using

a 9/16" socket. (See Photo # 3)

8. Remove the previously installed 3/8" x 1" thread cutting bolts & attach

the new Skyjacker nerf bar to the front upper frame rail using the

supplied 5/16" x 1" bolts, washers, nuts, & a 1/2" socket.

Note: Do

not completely tighten at this time.

9. Attach the new Skyjacker nerf bar to the rear upper frame rail using

the previously removed 3/8" x 1" thread cutting bolts & a 9/16" socket.

Note: Do not completely tighten at this time. (See Photo # 4)

10. Slightly drill the rear lower mounting location of the new Skyjacker

nerf bar to create a pilot mark using a 3/8” drill bit.

Note: Only create

a pilot mark,

do not completely drill this mounting location at this time.

11. Drill the previously pilot marked rear

lower mounting location of the new

Skyjacker nerf bar using a 5/16” drill bit.

Note: Be extremely careful not to drill

through the floor of the vehicle. (See

Photo # 5)

I-NBP103

Photo # 1

Photo # 2

Photo # 3

Photo # 4

Photo # 5

Advertising