Sunnex TS2015W (Wall) User Manual

Page 6

Advertising
background image


Sunnex Tristar Service & Installation Manual

6

1. The length of the board has been chosen so that two wooden wall

studs may be engaged during installation.

2. The wooden wall studs or surface holding the mounting board and the

four (4) lag bolts, SHOULD SUPPORT A MINIMUM OF 100 POUNDS
PULL ON EACH MOUNTING BOLT, AND A MINIMUM OF 100 SHEAR
ON EACH BOLT.

3. Use no smaller than 1/2” lag bolts. The bolts should penetrate the

wooden wall studs to at least a depth of 2 1/2”.

The pilot holes should be drilled beyond full depth to ensure the lag bolts are
not broken off during installation. These MINIMUM REQUIREMENTS are
called for in order to support loads applied each time the beam is adjusted.
CAUTION: IF METAL WALL STUDS ARE A PART OF YOUR FACILITY
CONSTRUCTION, ADDITIONAL STEPS MUST BE TAKEN TO ENSURE
THE LIGHT IS SAFELY INSTALLED.

WARNING! METAL WALL STUDS ARE TOO THIN TO ADEQUATELY
ACCEPT AND SECURE LAG BOLTS. ANY ATTEMPT TO DO ONLY THAT
WILL LEAD TO PROBLEMS OF SAFETY WHICH MAY INCLUDE THE
LIGHT FALLING FROM THE WALL.

ATTACHMENT OF LAMP HEAD/ARM/ASSEMBLY:

1. Attaching extension arm to wall board: Place the end of the extension

arm inside U-bracket and place plastic washers so that washers are
between U-bracket and end of arm. Secure arm end to U-bracket with
socket cap screws (2 X 1/4”-20), use provided Allen key (5/32). (See
following illustrations).

END OF

EXTENSION

ARM

Advertising
This manual is related to the following products: