Installation, Unit assembly prior to installation, Unit – Regency Horizon HZO42 Outdoor Gas Fireplace User Manual

Page 14

Advertising
background image

14

Regency Horizon™ HZO42 Gas Fireplace

INSTALLATION

UNIT ASSEMBLY PRIOR TO INSTALLATION

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side
and 1 on the top that can be folded out as required.
Secure the top and side nailing strips to the framing.

The 6 Standoffs must be correctly positioned and attached before unit is slid
into position.

STANDOFF ASSEMBLY

The standoffs are shipped in a fl at position and must be folded into shape
and attached.

1) Remove the standoffs from the fi replace.

2) Take each standoff and bend into the correct shape. Bend up at the bend

lines until the screw holes in the standoff and the pre-punched screw holes
on the fi replace top line up.

3) Attach the standoff securely to the unit with 2 screws per standoff (on

opposite corners).

S

tandoffs installed.

Nailing Strips

Note:

Depending on the material used for fi nishing, the nailing strips must
be set accordingly so that the fi nished material is always at the 1-1/2"
edge of the fl ange.

Finished

Material

Nailing Strip

Position

1/2"

1"

1"

1/2"

1-1/2"

0" (fl ush)

Unit

Nailing Strip
1” Forward

Unit

Nailing Strip
½” Forward

Unit

Nailing Strip
Flush w/unit
Factory Set

Advertising