Atlas ceiling system iom, Aorcs – Titus Atlas Operating Room Ceiling System (AORCS) User Manual
Page 8

I N S T A L L A T I O N & O P E R A T I O N M A N U A L
Atlas Ceiling System IOM
Installation & Operation
AORCS
Continue to install remaining main and cross tees to the initial string line layout. All tee to tee connections are made with the same
quick snap connecters. There is no difference in the connecters except how the quick snap connecters are placed on top of the tees
.
8
Interior connectors
Main Tee
Note: Hand tighten screws on interior
connectors to allow for installation of cross
tees. Completely tighten once both cross
tees have been installed.
"Quick Snap"
Connector
Cross Tee
Main Tee
Note: Continue installing main tee from one side of the
room/space working towards the opposite side. Installation
can be begin in the center, working outwards. Do not
install by working towards the center from two directions.