Ultralife UKT0011 User Manual

Page 10

Advertising
background image

Figure 3-5 Battery Installation

6. The unit can now be placed upright in normal operating position, with the handle up

and the non skid pad on the battery tray down to the mounting surface. The front
panel with the connectors will now be above the batteries and in front towards the
operator. See Figure 3-6 for a front panel overview.

Figure 3-6 Loaded Battery Box


7. System can be used without grounding but if the unit is to be grounded to earth or

other ground, connect ground stud on rear of unit at this time. A 12AWG wire or
larger is recommended for earth grounding. Figure 3-7.

UKT0011 CH0028/CH0027 Battery Box / Charger System Operation Manual

Newark, New York | 315-332-7100 | Fax: 315-331-7800

©2010 Ultralife Corporation • www.ultralifecorp.com • All specific subject to change without notice

The information contained herein is for reference only and does not constitute a warrant of performance •

30 SEP 10 UBI-5184 Rev: A

Page 10 of 17

Advertising