WarmlyYours SCV-DUAL User Manual

Page 8

Advertising
background image

Snow Switch

®

Model LCD–8 Aerial Snow Controller, 100 – 240 VAC

24782 Rev. A 03/13

(800) 234-4239

http://www.networketi.com

7 of 14

Environmental Technology, Inc.

Install in accordance with the requirements of all appli-

cable electrical and building codes and regulations. Ensure

that all conduit and cable terminations are watertight.

NEC Article 426.28 requires Equipment Ground Fault

Protection (GFEP) for Ice and Snow Melting Equipment.

This functionality is not provided as part of this controller

and shall be provided as part of the overall system.

Wiring: Direct Heater

BLK

L1

YEL

YEL

WHT

L2/N

100–240 VAC

50/60 Hz

Resistive load, up to 16 amps

(Self-limiting Cable, Constant-

Wattage Cable, MI Cable, etc.)

Wiring: External Contactor

BLK

L1

YEL

WHT

L2/N

100–240 VAC

50/60 Hz

K1

Inducitve load, up to 3 amps

(Contactor, Pump Motor,

Motorized Valve, etc.)

YEL

Wiring: Dry Contact

BLK

L1

WHT

YEL

YEL

L2/N

100–240 VAC

50/60 Hz

Dry Contacts

Advertising