Segment length, Installation – Weidmuller IE-SWxx-M Managed Switch User Manual
Page 5
Advertising
15
Segment Length
10 Base T
copper
100 m
100 Base TX
copper
100 m
100 Base FX
multimode fiber
2000 m Full Duplex
• connector SC and ST
Halb Duplex is not supported
1310 nm/ 62.5/ 125 µm optical budget 8 db
50/ 125 µm optical budget 4 dB
singlemode fiber
• connector SCS
9/ 125 µm cable 13 dB
Installation
The IE-SW14-24-M is for wall mounting and DIN-Rail mounting.
DIN-Rail mounting
Taking off the DIN-Rail
Wall mounting
Remove the infolded brackets
Fix the backets out-foulded
Only a qualified technician is allowed to install and operate the Switch.
There must be 25 mm free space on both sides for ventilation to the neighbour
on the DIN-Rail.
Advertising