Wood’s Powr-Grip PCFT2SA47 User Manual

Page 10

Advertising
background image

Rev 0.0/11-13

8

P2-DC2: #35114

3) Assemble the vacuum lifter as follows: Remove the pad channels from the shipping

containers, being careful to avoid damage to any vacuum pads. Position the pad channels on

a clean, flat surface as shown.















Use the hoisting equipment to position the lift frame between the channel rails, as shown.

Advertising