equipment design and applicable statutory or regulatory standards must be factored into any
specific installation. Consult the hoisting equipment manufacturer to determine how to mount

the vacuum package in a safe location that does not interfere with hoisting equipment
operation.

5) Inspect the vacuum line that runs from the lifter to the vacuum package: Make certain the

vacuum line is routed so that it does not become tangled, kinked, pinched or cut while
operating the lifter or hoisting equipment. Now the lifter is operational.

6) Perform Operational and Load Tests for the lifter as directed in MAINTENANCE: T