Armado de los componentes – Bradley Smoker S19-310SS User Manual

Page 12

Advertising
background image

12

S19-310SS

Installation

3/15/10

Bradley Corporation • 215-533 Rev. W; ECM 10-05-022

Armado de los componentes

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY FAX: (262-251-5817)

TEL: 1-800-BRADLEY FAX: (262-251-5817)

http://www.bradleycorp.com

http://www.bradleycorp.com

114-052

114-052

10

26.6

28

13

1

2

3

4

2

5

6

2

7

8

9.1

3

11

12

14

17

16

15

19

22

20

17

25.1

25.2

25.3

25.4

25.5

25.6

25.11

25.12

18

25.7

25.10

25.9

25.8

25

13.1

27

24

23

2

26.2

26.1

26.7

26.3

26.5

26.8

26.1

21

9.2

9.11

9

16

20.1

30

2

26.4

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.

Date
Datum
Date

Signed
Unterschrift
Signe

Date
Date

Date

Signed
Signed
Signed

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.

Nota: Si el acoplamiento en T se usa como
entrada, utilizar el tapón artículo Nº 2.

NOTA:

Los artículos del 9.1 al 9.2 vienen previamente montados como Artículo 9.

Los artículos del 25.1 al 25.12 vienen previamente montados como Artículo 25.

Entrada de

suministro

1-1/4" NPT

Salida de drenado

1-1/4" NPT

Control

del flujo

en este

extremo

Entrada de

suministro

1-1/4" NPT

Advertising