Assembage des composantes – Bradley Smoker S19-310SS User Manual

Page 8

Advertising
background image

8

S19-310SS

Installation

3/15/10

Bradley Corporation • 215-533 Rev. W; ECM 10-05-022

Assembage des composantes

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY FAX: (262-251-5817)

TEL: 1-800-BRADLEY FAX: (262-251-5817)

http://www.bradleycorp.com

http://www.bradleycorp.com

114-052

114-052

10

26.6

28

13

1

2

3

4

2

5

6

2

7

8

9.1

3

11

12

14

17

16

15

19

22

20

17

25.1

25.2

25.3

25.4

25.5

25.6

25.11

25.12

18

25.7

25.10

25.9

25.8

25

13.1

27

24

23

2

26.2

26.1

26.7

26.3

26.5

26.8

26.1

21

9.2

9.11

9

16

20.1

30

2

26.4

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.

Date
Datum
Date

Signed
Unterschrift
Signe

Date
Date

Date

Signed
Signed
Signed

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.

Alimentation

1-1/4" NPT

Orifice de vidange

1-1/4" NPT

NOTE: Les articles 9.1–9.2 sont préassemblés tel que 9.

Les articles 25.1–25.12 sont préassemblés tel que 25.

NOTE: Si le raccord en té (point nº 2) est utilisé comme orifice
d’admission, utiliser le bouchon (point nº 6) au point nº 2.

Alimentation

1-1/4" NPT

Contrôle

du débit,

ce bout

Advertising