Baumfolder D3 Drill (up to mid 2003) User Manual

Page 4

Advertising
background image

TP10429

4

D3 PAPER DRILL

Your new D3 Paper Drill has been designed to provide you
with years of useful service, provided it is installed, main-
tained and operated according to the instructions contained
in this manual.

The D3 Paper Drill has the capability for three drill heads,
and is available with a moveable table. Drill bits are
available in sizes ranging from 1/8” to 1/2” in diameter.

SAFETY INSTRUCTIONS

All guards, warning labels, lubrication and caution tags were
placed on this machine for your safety. Take time to become
familiar with all of them. These items must not be removed
from this machine.

The operation and maintenance of this machine should be
clearly understood. Besides exercising standard safety prac-
tices, operators, maintenance personnel and any other person-
nel involved with this drill, should be specifically instructed
on proper maintenance and safe operation of this machine.

All safety mechanisms are provided for your protection and
must not be altered.

WARNING

Do not operate this machine without all
guards in place.

Do not make any adjustments or perform any
maintenance on this machine with power on.

Keep the machine and the work area clean and free
of spills, to prevent accidents.

Be certain to replace any safety decals that may
have been detached for any reason.

INSTALLATION INSTRUCTIONS

This machine is shipped inside a protective wood frame.

The

following parts are packaged inside the machine at the fac-
tory:

Waste Can

Wood Blocks

Back gage Bar

Drill Sharpener

Back gage Blocks

Side Gage

Tools

Instruction Manual

Carefully remove the wood frame and look in waste can covers
to find these items. Back gage is located inside of door on left
side of Drill. Be sure to check off the parts received against the
packing list. Examine the machine carefully for any physical
signs of shipping damage.

The machine is fastened to the skid with two bands. carefully
remove the two bands. Remove the drill from the skid by lifting
between the 2 x 4’s that the drill is sitting on. On the bottom of
the drill are four leveling screws, use these screws to level the
machine.

BACK GAGE INSTALLATION

Place the back gage bar at the rear of the table top. Insert the
two clamp knobs through the clearance holes provided in the
bar. Screw the clamps onto the bottom of the threaded rod that
extends from the clamp knobs. Place the two back gage blocks
on the bar so that the thumbscrews are pointing toward the rear
of the machine. Set the bar using the scales on the right and left
sides of the table.

SIDE GAGE INSTALLATION

Slide the side gage assembly into the T-slot provided in the table
top. Slide the side gage to a location desired on the table scale
and tighten the knob by hand.

WASTE CAN INSTALLATION

Slide the waste can into the opening in the side of the drill.

T00LS

A convenient accessories drawer has been provided under the
top guard.

HYDRAULIC SYSTEM

Checking the hydraulic oil level in the reservoir is done by re-
moving the Fill Cap. The return line hose may remain connected.
The oil level must be just below the fitting that the Fill Cap fits
into. Do not overfill.

The hydraulic system has a flow control valve, which regulates
the speed that the drill bits decend through the paper. Turning
the flow control knob clockwise increases the speed of the de-
scent. Turning the knob counter-clockwise will slow down the
descent of the drill bits.

When using drill bits with a diameter under 1/4”, it is recomended
to slow down the descent of the bits, decreasing the probablility
of bits breaking and clogging.

Advertising