Installation step 1 – Bully Dog 40390 PCH with Pyrometer Lead User Manual

Page 9

Advertising
background image

8

installation Step 1

pOST-TURBO MOUNT

1. Find a location on the post turbo exhaust pipe or “down tube,” that is 3”, plus or minus 1”, downstream

from the turbo charger exhaust outlet. Drill a

5

/

16

” hole and run a

1

/

8

” pipe tap into the hole. Mount the

Pyrometer Probe in the threaded hole using a

9

/

16

” wrench to tighten the probe holder or tube fitting to

the down tube. Then tighten the Pyro Probe Cap to the holder using a

5

/

8

” wrench.

2. Run the Pyro Cable along the brim of the engine bay, and then let the end sit when installing the PCH

Board.

TOOL TIp, pOST-TURBO MOUNTINg

For some vehicles it will be impossible to reach the turbo downpipe with a drill and a pipe tap. The down-
pipe may have to be removed. The ideal time to install a post turbo pyrometer is when a new exhaust is
being installed on the vehicle.

3”

Exhaust Downpipe

Advertising