Pm t v er sio n u pda te – Bully Dog PMT 07.5-08 Dodge 6.7L Cummins Version 1.0.1.5 User Manual
Page 3
 
PM
T V
er
sio
n U
Pda
Te
Parts Installation:
refer to the PMT installation Manual to identify the parts 
described below. The installation overview provides a 
quick reference installation guide for the 6.7L Cummins. 
see the install overview below. There are three general 
steps that need to take place to install the PMT on the 
6.7L Cummins:
1. The first step in installing the PMT and all of the parts 
is determining the mounting position for the PMT. There 
are two mounting positions offered for the PMT: add on 
dash Mount and Universal dash mount. see the PMT 
mounting section in the PMT instruction Manual to 
reference installing the dash Mount.
2. The second step includes running the Cradle 
Cable from the PMT mounting position down 
to the oBd ll block, and plugging it into the 
oBd ll block. see the oBd ll diagram below to 
see the location of the oBd ll port and how the 
Cradle Cable plugs into the oBd ll block. For in-
depth instructions refer to the PMT installation 
manual.
3. run the Power Wire through the fire wall, from inside the cab, and 
into the engine bay. This can be done without drilling holes by accessing 
on of the exiting holes used to run oeM wiring harnesses. once in the 
engine bay locate the fuse box which can be found near the drivers side 
headlight. open the fuse box and locate fuse number 28. Using the fuse 
jack and spade connector, connect the power wire to fuse number 28.
Installation Overview
PMT & Cradle
OBDII Adapter Plug
OBDII Port
Cradle Cable
Power Wire
Fuse Box
Fire wall grommet
‘07.5-’08 6.7L Cummins Installation Overview
‘07.5-’08 6.7L Cummins OBD ll diagram
Connect power to Fuse 28