Landing gear installation – E-flite Edge 540 BP 3D ARF User Manual
Page 14
Advertising

14
E-flite Edge 540 BP ARF Assembly Manual
Landing Gear Installation
Required Parts
Assembled airframe
Tail gear assembly
Main gear strut (2)
Main wheel, 1
7
/
8
-inch (48mm) (2)
10mm plastic wheel spacer (2)
4-40 nut (2)
4-40 lock nut (2)
4-40 x 1-inch socket head screw (2)
2mm x 15mm machine screw (2)
2mm nut (2)
Required Tools and Adhesives
Pliers
Phillips screwdriver (small)
Hex wrench:
3
/
32
-inch
Thin CA
6-minute epoxy
Threadlock
1. Locate the tail gear wire. Use 6-minute epoxy to glue the
wire into the slot in the bottom of the rudder.
2. Attach the main gear to the fuselage using two
2mm x 15mm machine screws and the two 2mm nuts.
Use a drop of thin CA or threadlock on the nuts to
prevent them from vibrating loose.
Advertising