Installation, Unpacking/power hookup, Setup instructions – GBC MS5 User Manual

Page 7

Advertising
background image

7

F.300-B/MS-5 DRILL/JULY 2000

INSTALLATION

Unpacking

Unless otherwise specified, this machine is packaged
completely assembled. The drill head(s) specified on
the order are shipped already installed. The machine
should be unpacked carefully by removing the pack-
aging materials without damaging any of the machine
parts.

Immediately after uncrating, check off parts received
against the packing list. Also, examine for any physi-
cal signs of damage incurred during shipment. The
machine is inspected before and after crating at our
plant. The responsibility for filing a claim against the
carrier for damages incurred during shipment rests with
the receiver of the goods (FOB our factory).

The machine is held in place on its shipping skid with
plastic strapping material. The machine weighs ap-
proximately 850 lbs. (380 kg.), so be sure you have
sufficient equipment and manpower to handle the ma-
chine safely. Contact your Authorized Challenge Dealer
to arrange for installation.

Remove the protective coating of light oil from the
machined surfaces with a cleaning solvent, such as
type wash. Clean all other surfaces with a solvent such
as C.R.C.

Power Hookup

The machine is factory wired to the customer’s speci-
fication. It is the customer’s responsibility to wire the
motor for the current and voltage specified on the name
plate. It is important that the line voltage specified be
maintained. Failure to do so will result in improper op-
eration of the machine (see trouble shooting section
for specific problems). It may be necessary to provide
a dedicated line for the machine.

The standard motor for this machine is a 208/230 single
phase. This machine should be on a 30 amp circuit

and wired with #10 gauge wire. Optional three phase
motors are available also; 230/208 three phase, 20 amp
circuit, #12 GA. wire; and 460 volt three phase, 15 amp
circuit, with #14 GA. wire.

Remove the lower front cover. Remove the knockout
plug on the right side of the machine. Route the power
cord through the knockout hole and secure using a
conduit connector. Connect wire leads to terminals as
shown in fig 2 (single phase use L1 and L2 only). Con-
nect the ground lead to the power panel as shown.
Replace the front cover.

On three phase machines, check to see that the motor
turns in the proper direction. Briefly turn the machine
on and off then look at the belt. If it turns in the oppo-
site direction of the arrow on top of the motor, discon-
nect power to the machine and switch the connection
of any one wire with another. Check the rotation of the
motor again to be sure it turns in the proper direction.

SETUP INSTRUCTIONS

Starting the Machine

The power for this machine is supplied by two motors;
one is for the hydraulic power pack and the other is for
the spindle. The hydraulic motor drives the pump di-
rectly while the spindle motor drives the drill heads.
The two motors are started and stopped simultaneously
by “on” and “off” push-buttons located on the control
panel (the main disconnect switch must be in the “on”
position, see fig. 3). The on button has a collar guard
to reduce the possibility of accidental contact. Be sure
both motors are operating before trying to drill paper.

WARNING: DISCONNECT POWER be-
fore cleaning, lubricating, servicing, or
making adjustments not requiring

power. Lock the disconnect switch in the OFF
position (see Power Lockout Procedure,

pg. 4

).

NOTE: All guards and instruction plates are in-
stalled for your safety and information and must
remain on the machine as shipped from the fac-
tory.

Ground

Power Panel

Fuse

(fig. 2)

Advertising