Section 3: installation, 01 site selection, 02 electrical input connections – Tweco C-70A CUTSKILL User Manual

Page 15: 03 compressed air connection

Advertising
background image

Manual 0-4679

3-1

Installation

SECTION 3:

INSTALLATION

3.01 Site Selection

• Place in a clean and dry area.

• Provide adequate ventilation and fresh air sup-

ply.

• Ideal ambient temperature should not exceed

40°C / 104°F. Temperatures exceeding that may
diminish cutting capacity or quality.

• The cutting machine must be placed on an even,

firm surface so that it stands firmly.

WARNING

This equipment must be electrically connected
by a qualified electrician.

3.02 Electrical Input Connections

• Input voltage is 230V ± 10%, 50/60 Hz single

phase or three phase.

CAUTION

Check your power source for correct voltage be-
fore plugging in or connecting the unit. The
primary power source, fuse, and any extension
cords used must conform to local electrical code
and the recommended circuit protection and wir-
ing requirements as specified in Section 2.0.

3.03 Compressed Air Connection

• An air compressor is required and should be con-

nected to rear panel of power source by air hose.

• Air pressure should be .5MPa (5 bar) and air

should be dry and clean.

• Air flow should be 400 scfh / 6.6 scfm (188.7 lpm)

minimum.

Input Power
Cable

Connect Air
Here

Art # A-04486

DANGER

Do not cut in humid or wet surroundings.

• Before you maintain or replace torch parts, wait

for the post flow air cycle (approximately 10 sec-
onds), to stop, then turn the machine off.

• Always use original manufacturers parts. The use

of aftermarket parts could result in shorter parts
life and in unsatisfactory cutting results. Any war-
ranty claims would be waived.

• Worn parts should be recycled according to local

requirements.

NOTE

Repairs must be done by skilled and qualified
personnel only.

Advertising