Cutskill 35a – Tweco 35A CutSkill Power Supply User Manual

Page 23

Advertising
background image

cutskill 35A

June 30, 2009 4-3 OPERATION

C. Check Primary Input Power Source

1. Check the power source for proper input voltage. Make sure the input power source meets the power

requirements for the unit per Section 2, Specifications.

2. Connect the input power cable (or close the main disconnect switch) to supply power to the system.

D. Gas Selection

Ensure gas source meets requirements listed in section 2T. Check connections and turn gas supply on.

E. Connect Work Cable

Clamp the work cable to the workpiece or cutting table. The area must be free from oil, paint and rust. Con-

nect only to the main part of the workpiece; do not connect to the part to be cut off.

Art # A-03387

F. Power On

Place the power supply ON / OFF switch to the ON (I) position. Power indicator

turns on.

Art # A-09181

RUN

SET

CURRENT (A)

15

25

35

READY

AIR

OVERHEAT

POWER

Front Panel With Power ON/OFF Indicator

G. Set Operating Pressure

Place the power supply RUN / SET switch to the SET (down) position. Gas will flow. Adjust gas pressure to

65 psi / 4.5 bar. Air indicator turns on.

NOTE

If gas regulator leaks, reset gas pressure to 0 psi, then reset to 65 psi / 4.5 bar.