08 gas connections, 07 primary input power cable connections – Tweco PakMaster 50XL Plus (CE) User Manual

Page 19

Advertising
background image

Manual 0-2780

13

SECTION 3: INSTALLATION PROCEDURES

Voltage Selection

Connector

380/415 Volts

220 Volts

Voltage Selection

Label

A-02628

Not Used

Figure 3-2 Input Voltage Selection

3.07 Primary Input Power Cable

Connections

All units are supplied from the factory as 380/415V, three
phase with a six foot EMC input power cable installed.

A. Single or Three Phase Operation

220V units may be either single or three phase. Depend-
ing on the type of operation, the primary power cable
wiring may need to be changed by the user. Refer to the
following procedure to connect the supplied input EMC
power cable to the customer power source:

For Single-Phase Operation:

Single-phase operation requires a 2-conductor cable
with ground.

a. Locate the ground stud and remove the top nut

and washer.

b. Install a lug terminal on the ground wire.

c. Place the ground wire onto the ground stud

and secure with the nut and washer.

d. Insert the other two wires into the L1 and L2

terminals on the contactor.

e. Tighten all set screws.

AC Input

Power Cable

L1

L2

GND

Input Contactor

A-01330

Figure 3-3 Primary Power Cable Connections -

Single-Phase Operation

For Three-Phase Operation:

Three-phase operation requires a 3-conductor cable
with ground.

a. Locate the ground stud and remove the top nut

and washer.

b. Install a lug terminal on the ground wire.

c. Place the ground wire onto the ground stud

and secure with the nut and washer.

d. Insert the other three wires into the L1, L2, and

L3 terminals on the contactor.

e. Tighten all set screws.

AC Input

Power Cable

L1

L2

L3

GND

Input Contactor

A-01329

Figure 3-4 Primary Power Cable Connections -

Three-Phase Operation

Advertising