Grounding wire installation – Tweco SC-6 Standoff Control User Manual

Page 5

Advertising
background image

5

SC-6 STANDOFF CONTROL INSTALLATION 0-2454

2. Connect the plug on the Wire Harness Assembly to J8 on the Pilot PCB Assembly.

J8

Pilot Wire

Harness

Connector

Figure 6 - Connection to Pilot PCB

Grounding Wire Installation

The ground wire supplied with the SC-6 must be modified with a longer wire. Refer to Figure 7 and install the
wire as follows:

1. Cut the end off the ground wire soldered to the SC-6 Voltage Divider PCB Assembly.

2. Strip the end of the wire.

3. Connect the extra length of ground wire to this stripped wire with the supplied inline splice.

4. Connect the loose end of this extended ground wire to the primary ground stud of the control module.

WARNING

Do not attach the ground wire to the Voltage Divider Panel.

GND

L-1

L-3

L-2

Insert wire into terminal block
and tighten set screw

Figure 7 - Ground Wire Installation

Reinstall the enclosure cover by reversing the steps in “Opening The Enclosure” above.

This completes the installation of the components inside the STAK PAK

®

Control Module.

Advertising