Figure 1. rfid mounting post – Unitec ReachFree ID for Wash Select II User Manual

Page 7

Advertising
background image

R E A C H F R E E I D

Document Number:

RFID1002

3

Document Name:

Unitec RFID Field Retrofit Installation Guide for WSII

Figure 1. RFID Mounting Post

To mount the post, the installer will need to drill (4) holes and use concrete anchor bolts to secure
the flange to the concrete, as shown below. The flange should be flush to the side of the entry unit,
as shown in Figure 5.

Advertising