Wheatheart Transfer Auger User Manual

Page 19

Advertising
background image

W

HEATHEART

M

ANUFACTURING

- T

RANSFER

A

UGER

3. A

SSEMBLY

8”, 10”, & 13”

3.2. H

YDRAULIC

D

RIVE

T

RANSFER

A

SSEMBLY

IM2 R2

19

2. Install a control valve (9) onto the hydraulic motor using the 5/16” Allen head

bolts (10). Install hydraulic fittings into the control valve (see Figure 3.6).

8”, 10”,

AND

13”

MODELS

:

1. Attach axle (12) to tube (11) with four 5/16" x 1-1/2" bolts (16) and locknuts

(17) (see Figure 3.5 A). Locate the axle band so that the hopper is 1/2" (1.27
cm) off the ground.

2. Install frame stiffeners (21) on axle (12) and secure with bolt (22) and locknut

(23).

3. Place wheels (18) on axle (12) and anchor each with a 3/4" washer (19) and

cotter pin (20).

4. Refer to Figure 3.5 B for the poly transfer frame assembly.



P

OLY

M

ODEL

1. Remove the plate protecting the top of the hydraulic motor and place #112 o-

rings into the recessions in the top of the hydraulic motor.

2. Install a control valve (9) onto the hydraulic motor using the 5/16” Allen head

bolts (10). Install hydraulic fittings into the control valve (see Figure
3.6).Connect upper end of tube
support (25) to tube (24) with two 3/8" x 1-1/
4" bolts (29), 3/8" flat washers (31), and 3/8" locknuts (30). Refer to Figure
3.6.

3. Connect lower end of tube support (25) to tube (24) with tube clamp (26),

bolts (27), and locknuts (28).

Figure 3.5 A

B

Advertising