Warning – Baseline Systems BL-Commander User Manual

Page 15

Advertising
background image

Wiring Your Universal Receiver Connection System

Instructions also provided with Universal Receiver Connection Assembly

Warning

Do not have the Receiver plugged into connector cable while installing connector or damage

may occur.

Do not have 24VAC transformer plugged into Receiver

with the connector when the connector has

24VAC from the controller

!

Step 1:

Use (figure 4 from the pamphlet with your PCC) as a pattern to
locate the mounting holes to be drilled through the controller.

Step 2:

Peel off sticker and attach gasket on back of housing.

Step 3:

Peel off sticker and attach gasket to inside door. Make sure
gasket is snug against side walls for maximum seal.

Step 4:

Locate 1" socket head cap screw and insert though the hole on
door. Slip on retainer ring approximately 3/16" from threaded
end of cap screw.

Step 5:

Mount housing to controller using two 6-32 x 3/4" machine
screws, two flat washers, two lock washers, and two hex nuts.

Step 6:

Attach D-Sub connector to the inside housing with two 4-40 x
9/16" machine screws. Do so by first inserting the end of wires
through the 1/2" hole in the sprinkler controller. Attach
connector with the longer row of pins to the left. Hold connector
to highest position while tightening. Follow wiring code for
connecting cables.

Advertising